top of page

© 2024 Cheshire West and Chester Council

© 2024 Cheshire West and Chester Council

Northgate Arena Refurbishment

Updated: 13 hours ago

The Northgate Arena is undergoing a major transformation.  A partial closure of the building started on 6th January 2025, with works scheduled to be completed in Spring 2026.  Key highlights of the refurbishment include:

  • Transformed pool area: The pool will feature interactive play equipment, a modern water slide, upgraded viewing balconies, improved décor with new flooring and pool linings, and enhanced accessibility with pool pod lifts.              

  • Refreshed gym: The gym will be equipped with the latest technology, new flooring, better lighting, advanced air cooling, and dedicated changing areas.

  • Upgraded sauna and steam room: Private changing rooms and relaxation spaces will be part of the enhanced sauna and steam room.

  • Improved changing areas: Family-friendly village changing rooms, poolside showers, and separate areas for gym and studio users will offer improved comfort and privacy.

  • New and modern studio spaces: Cycling, multi-activity, and fitness studios will be upgraded with modern flooring, lighting, and air-cooling systems.

  • Upgraded outdoor space: The outdoor area will see improved accessibility, mobility transport storage, cycle storage, and new signage.

  • Eco-friendly solutions: Energy-saving LED lighting, solar panels, reducing the main leisure pool depth along with pool filtration upgrades will all improve the Arena’s sustainability.

  • Improved building structure: a major refurbishment of the building’s mechanical, electrical and plumbing systems, including improvements to windows and doors, to bring the arena up to modern standards.

You can keep up to date with progress and see a video about the refurbishment at: https://www.brioleisure.org/northgate-arena-updates




Comments


bottom of page