top of page

© 2024 Cheshire West and Chester Council

© 2024 Cheshire West and Chester Council

Walking, wheeling and cycling

The One City Plan stresses the importance of improved walking, wheeling and cycling infrastructure in making Chester accessible, easy to travel around and welcoming to all. The Connecting Group will build on the existing network of routes across Chester, to link neighbourhoods to and through the city centre. We have already conducted an audit of the existing cycle routes across the city and are progressing design work on several routes. We have secured funding towards starting to overcome the barrier to access caused by the inner ring road, with improved connectivity between Chester Northgate and St Anne’s Street.

 

Further detail on the planned network of walking, cycling and wheeling infrastructure across the borough and throughout Chester is set out in the Cheshire West and Chester Local Cycling and Walking Infrastructure Plan, available at: https://www.cheshirewestandchester.gov.uk/residents/transport-and-roads/cycling/cycling-and-walking



Comments


Commenting has been turned off.
bottom of page